TSK_Logo.jpg

Talisker Resources Ltd.

Company Data | Introduction | Projects in Hand | Management
News Update
| Chinese

Address :  Suite 400 – 350 Bay Street
Toronto, Ontario
Canada M7A 0A7
Tel No.: 416-837-0075
Web Site: www.taliskerresources.com
E-mail: carrie.howes@taliskerresources.com
Contact Person: Carrie Howes
Position: Director, Investor Relations


Company Data

Traded Market: CSE / OTCQX
Traded Symbol: TSK / TSKFF
Outstanding Shares: 167M
52 Week High: $ 0.65
52 Week Low: $ 0.14
Present Price: Click Here


Introduction

Tsk1.jpg

Tsk2.jpg

Tsk3.jpg

Tsk4.jpg

Tsk5.jpg

Tsk6.jpg

Talisker is a junior resource company involved in the exploration of gold projects in British Columbia, Canada. Talisker's projects include the Bralorne gold complex, an advanced-stage project with significant exploration potential from a historical high-grade producing gold mine, as well as its Spences Bridge project where the Company holds approximately 85 per cent of the emerging Spences Bridge gold belt and several other early-stage Greenfields projects. The Company is well funded to advance its aggressive systematic exploration program at its projects.

Talisker is a Dominant Explorer in Southern British Columbia

  • Over 270,000 ha in Mineral Claims
  • Majority control of three Canadian gold belts, one Orogenic, two Epithermal
  • Bralorne
    • Historic Camp
    • Significant Potential
  • Spences Bridge
    • Emerging
    • Eight drill targets
    • 100 anomalies
  • Remington
    • Frontier
    • New discoveries
  • Excellent road access direct from Vancouver


Projects in Hand

Bralorne Gold Project, British Columbia

Talisker acquired the Bralorne Gold Project in December 2019. Located in southern British Columbia, the Bralorne mine complex produced approximately 7.3 million tonnes at a grade of 17.7 g/t Au for 4.2 million ounces of gold from 30 veins in three adjacent mines; Bralorne, Pioneer and King, until eventual closure in 1971 due to depressed gold prices.

  • Historic mining at Bralorne and Pioneer averaged 115,000 oz per 50 m vertical panel (2,300 oz/vertical meter)
  • Mining halted in 1971 at the 20 Level (900 m depth) on all except the 77 vein (due to US$35/oz gold), mining on 77 vein to 1.9 km depth
  • 33 other veins identified, evidence for all 63 to be open at depth and many along strike
  • Existing compliant near surface resource of 663,600 t @ 9.4 g/t for 174,400 oz
  • 45,000 drift sample database
  • 1,931 drillhole database (225 km)
  • 14 other smaller mines requiring exploration at depth
  • All veins remain open at depth and most along strike

Exploration Drill Plan

Talisker is undertaking a 17,000 m drill program targeting high-grades veins at the Bralorne gold project.

  • Stage 1 – 3000 m Shallow vein strike extension targets 100-750 m from surface
  • Stage 2 – 6-7,000 m Deep vein strike extension targets 750-1,500 m
  • Stage 3 – Dip extensions in 500 m panel below 900 m (planning underway)
  • Stage 4 – Dip extensions in 500 m panel below Stage 3 (planning underway)
  • Ongoing target generation for additional under-explored close to surface veins and along trend
  • Drilling commenced Q1
  • Stage 1 and 2 scheduled to be complete Q3 2020

Q1 Drilling Highlights

  • Five drill holes completed
  • High grade gold results from the first 2 drill holes (SB-2020-001 and SB2020-002) from the Pioneer mine area: (see press releases dated April 1 and May 5, 2020)
    • 11.3 g/t Au over 0.9 m from 237.50 m to 238.40 m intersecting the PHW Vein
    • 27.3 g/t Au over 0.6 m from 364 m to 364.6 m intersecting the P Main Vein Splay
    • 3.42 g/t Au over 1.58 m from 437.92 m to 439.5 m intersecting the J Vein
    • 16.45 g/t Au over 0.5 m from 447.9 m to 448.4 m intersecting the J Vein Splay
    • 17.35 g/t Au over 0.80 m from 247.40 m to 248.20 m intersecting the PHW Vein
    • 32.20 g/t Au over 0.97 m from 414.40 m to 415.37 m intersecting the P Main Vein
  • Significant gold mineralization identified in the altered halos surrounding the veins – potential to decrease dilution during resource modelling phase

Aggressive Greenfields

  • 85% control of Spences Bridge Gold Belt
  • 100% control of Remington Gold Belt
  • Major company style systematic greenfields geochemical program
  • 22 geologists in the field during 2019
  • 4000 Stream Sediments
  • Building long term robust project pipeline
  • Mergers and Acquisitions (M&A) activities to increase control
  • Capitalize on year round field season to accelerate exploration timeline
  • C$3.5M Budget for 2020

Investment Highlights

  • Control majority of gold belt in Canadian jurisdiction
  • Proven ability to execute large exploration programs
  • 100% ownership of claims
  • Experienced management team with track record of discoveries
  • Proprietary understanding of vein formation
  • Location allows for accelerated exploration timeline
  • Well funded
  • Strong institutional shareholder base including 1832 Asset Management, Sprott, RBC, Equinox, Gold 2000, Donald Smith, K2 and others.


Management

Management and Directors

Terry Harbort, CEO, President, Director

PhD in Structural Geology and Tectonics

Specialist in mapping and interpretation of ore geometries and ore controls

Recognized senior member of the discovery team of AngloGold Ashanti's La Colosa and Gramalote deposits

Co-founder and VP Exploration, Talisker Exploration Services Inc. and former Director and VP Corporate Development, Sable Resources Ltd. and former Chief Geoscientist, Barkerville Gold Mines Ltd.

Andres Tinajero, CFO, Director

MBA and Member, Canadian Institute of Chartered Professional Accountants, the Certified Practicing Accountants of Australia and Certified member, Institute of Corporate Directors

Served as CFO and Vice President of Finance of several medium sized public companies across Canada

Michael McPhie, BSc, MSc, ICD.D, VP Sustainability and External Affairs

25 years senior experience in the natural resources sector

Specialist in regulatory issues for mining projects and operations

Leonardo de Souza, BSc, P.Geo., QP, VP Exploration & Resource Development

35 years experience in mineral exploration and 21 years in mineral resource estimation

Ruben Padilla, PhD, Director of Geology

Over 30 years experience in the mineral exploration industry

Luis Arteaga, BSc, MSc, P.Geo., QP, Exploration Manager

Over 13 years experience in precious metals exploration

Tom Obradovich, Executive Chairman

Over 35 years experience in mining exploration, development and financing

Brent Gilchrist, Director

Accomplished finance executive with extensive experience in the investment and banking sectors

Morris Prychidny, Director

Chartered Accountant with over 35 years experience in the mining, entertainment and real estate industries

Blair Zaritsky, Director

Chartered Professional Accountant with over 15 years of professional experience


News Update

On August 20, 2020, Talisker Resources Ltd. announced that it has granted, in accordance with the company's stock option plan, an aggregate of 1.3 million options to purchase common shares of the company to certain officers, employees and consultants. All of the options granted are exercisable at 46 cents, with 1.1 million options exercisable for a period of five years and 200,000 options exercisable for a period of two years.

On August 23, 2020, Talisker Resources Ltd. has closed the bought deal private placement initially announced on July 22, 2020, for total gross proceeds of $23-million. In connection with the offering, the company issued an aggregate of 28,260,870 units at a price of 46 cents per unit and 15,625,000 charity flow-through share units of the company at a price of 64 cents per flow-through unit.

On August 10, 2020, Talisker Resources Ltd. announced that an underground dewatering and rehabilitation program has been initiated at Talisker Resources Ltd.'s wholly owned Bralorne gold project located in south-central British Columbia. This program is being assisted by JDS Energy and Mining Ltd., which has responsibility for underground condition assessment, safety and geotechnical considerations; Weymark Consulting Ltd., mine engineering and project management support; and Integrated Sustainability Consultants Ltd., which has supported the operation of the advanced microfiltration water treatment system at the site.

On July 30, 2020, Talisker Resources Ltd. announced that it has qualified to trade on the OTCQX Best Market. Talisker shares begin trading on the OTCQX under the symbol TSKFF.

On July 22, 2020, Talisker Resources Ltd. announced that further to its earlier news release, the Company has agreed to increase the size of the bought deal private placement due to the high level of interest. The Company will now issue 28,260,870 units, priced at 46 cents per unit ($13-million) and 15,625,000 charity flow-through (FT) share units, priced at 64 cents per charity FT unit ($10-million), for total gross proceeds of $23-million.

On July 16, 2020, Talisker Resources Ltd. announced results from hole SB-2020-005, the remainder of SB-2020-005A (737.4-1013.1 m), as well as SB-2020-006 and SB-2020-007 from the Company's 17,000 m drill program at the Bralorne Gold Project located in British Columbia.

Highlights include:

  • SB-2020-006 – Bralorne Area
    • 5.96 g/t Au over 1.00 m
      • Including 11.2 g/t Au over 0.5 m
  • SB-2020-007 – Bralorne Area
  • 7.20 g/t Au over 3.45 m
    • Including 3.18 g/t Au over 0.95 m
    • And 31.10 g/t Au over 0.65 m

On July 8, 2020, Talisker Resources Ltd. announced that the Company has entered into an asset purchase agreement with TDG Gold Corp. ("TDG Gold") for TDG Gold to acquire several of Talisker's mineral resource properties located in the Toodoggone region of the Province of British Columbia. The Properties being acquired by TDG Gold consist of: the Baker Project; the Shasta Mine and the Baker mill infrastructure and equipment; the Chappelle property; the Mets lease; and the Bot property.

On July 6, 2020, Talisker Resources Ltd. announced that the Company will be adding a second drill rig in July at the Bralorne Gold Project, British Columbia. In addition, Talisker will be increasing its drill plan from 11,200 m to approximately 17,000 m.

On June 9, 2020, Talisker Resources Ltd. has released results from holes SB-2020-003 and SB-2020-004 as wells as partial results for hole SB-2020-005A from the Company's drill program at the Bralorne gold project located in British Columbia.

Highlights include:

  • SB-2020-004 – Pioneer area:
    • 27.60 g/t Au over 0.50 m
    • 12.65 g/t Au over 0.50 m
  • SB-2020-005A – Bralorne area:
    • 19.97 g/t Au over 5.10 m
      • Including 20.8 g/t over 0.6 m
      • And 57.8 g/t over 1.5 m
    • 5.81 g/t Au over 0.97 m


  Disclaimer

Copyright (c) 2000 - 2020 Chinese Investment Club Inc.
All Right Reserved. Do not duplicate or redistributed in any form.
版權所有, 未經同意, 不得以任何形式轉載或翻印